What are the long term costs of the new building to maintain? Will the project be financially sustainable?

There are a number of factors that will determine the ongoing maintenance and operations of the new school. In terms of operating costs, the building will be designed to meet or exceed the standard set forth by LEED. This means that the energy efficiency of the design will be at a minimum of 25-30% greater than the standards required by the current state building code. This added efficiency will allow for greater energy savings and will help maintain operating costs. The SBC believes that the new school will be vastly more efficient to operate than the current building and will provide for more consistent cost control due to its design, green technologies, and efficiencies. When determining future operating costs and maintenance costs of the new school one must consider the efficiencies that will be realized in the new school vs. current expenditures to operate and maintain the existing school. Once the calculations of operating and maintenance of the new building are compared with the cost of the old building we believe the net result will be a better value for the Lowell School District (added technology will result in higher electrical costs).

Show All Answers

1. How much will the new school cost?
2. How will this project be funded?
3. Who is accountable for the costs associated with this project? How can we be sure the taxpayers’ money is being managed properly?
4. What are the long term costs of the new building to maintain? Will the project be financially sustainable?